Mark it before you make it.

Catch every error before it reaches the shop floor.

Upload a facade shop-drawing set. FacadeCheck audits every sheet against facade standards and your system's own design document, cross-references the whole set, and marks each issue right on the drawing — with the reason.

first set up to 25 sheets — on us
Minutesnot a day of manual review
161findings on a real 62-sheet set
Every sheetcross-referenced
Works with PDFDWG · soonDXF · soonIFC / BIM · soon
SHEET 459 · HORIZONTAL SILL DETAIL
SCANNING…
EXTERIOR INTERIOR 6" 1459
#12 · FAILWeep hole not shown
#18 · REVIEWDepth 4½″, not 6″
#31 · WHOLE-SETDetail 459 never called out

What it catches — every facade type

SYSTEM01
Matches system designFlags deviations from manufacturer profiles, depths and required dimensions.
COORDINATION02
Callouts & details alignFinds orphan details, dead callouts and mismatched references across sheets.
SCHEDULES03
Schedules match drawingsCatches missing, inconsistent or conflicting part and glass codes.
GLASS04
Glass schedule conflictsVerifies the glazing shown matches the glass schedule everywhere.
DIMENSIONS05
Complete & buildableDetects missing, broken or contradictory dimensions that block fabrication.
CONNECTIONS06
Anchors & embeds shownFlags missing attachment details, embeds or unclear connection intent.
WATER07
Sealing & drainageChecks flashing, weep paths and sealant / backer-rod continuity.
SHEET08
Notes, titles & datesFinds typos, wrong revision dates, missing north arrows and titles.
PlusSetting blocksBacker rod & sealantAir/vapor barrierThermal breaksFastener calloutsTolerance stack-upSection cutsDetail keysCross-sheet referencesSheet indexNorth arrowsLabel usage
Built for everyone who draws, checks, or signs off on the drawings.
▤
Facade & glazing contractors
shop drawings
◈
Curtainwall fabricators
pre-fab QC
▧
Drafters & drafting firms
drawing production
△
Facade engineers
design review
▥
Estimators
bid & takeoff QC
◧
Glazing subcontractors
submittal prep
▦
General contractors
trade coordination
⬡
Architecture firms
submittal review
How it works

Three steps. Minutes, not a day.

01 · UPLOAD
Drop the setYour shop-drawing PDF, plus the system design document if you have one. Up to 180 sheets.
↓
02 · AUDIT
We read every sheetEach sheet checked against facade standards and your system's rules, then the whole set cross-referenced.
↓
03 · DOWNLOAD
Marked drawing + reportEvery issue flagged on a copy of your PDF — red for fail, orange for review — each with the reason.
→
Why it matters

A missed detail gets more expensive every day it survives.

The same error costs almost nothing to fix on the drawing — and a fortune once it's fabricated, installed, or found by your client. FacadeCheck moves the catch as far left as it goes.

CATCH HERE
On the drawing
$0
A red-pen fixCorrect it before anyone cuts metal. Minutes of edits.
At the shop
$$
Rework & re-orderRe-fabricate the part, re-issue the sheet, absorb the delay.
In the field
$$$$
Tear-out & reinstallAccess, scaffolding, water testing — 10× the shop cost.
The client finds it
✕
The hardest costA leak, a callback, a schedule hit — and the next project that doesn't come.
Security & privacy

Your drawings are yours. Full stop.

Uploads are encrypted in transit and at rest. Your drawings are never used to train public models, never shared, and can be deleted on request. NDA-friendly, built for proprietary project work.

✓ Encrypted in transit & at rest
✓ Never used to train public models
✓ Delete-on-request & retention controls
✓ NDA-friendly

"We are opening FacadeCheck to a small group of facade teams before anyone else. If you review shop drawings for a living, we would like your set and your criticism."

Serdar Bozoğlan · founder, facade engineer
FAQ

Answers before you upload.

What files can I upload?Vector or scanned PDF today. DWG, DXF and IFC/BIM are on the roadmap. Sets up to 180 sheets / 120 MB.
Which standards does it check?Facade QC conventions (AAMA / ASTM / EN references) plus the rules derived from your own system design document.
How accurate is it?It flags candidates for a human to confirm — it never silently drops a sheet. You review each flag; nothing is auto-approved.
Is my project data safe?Encrypted, never used to train public models, deletable on request. See Security above.
What does it cost?Your first set (up to 25 sheets) is on us, then $5 per sheet — no long contract.
Does it replace my reviewer?No — it's the tireless first pass. Your engineer signs off; FacadeCheck makes sure nothing reaches them unchecked.

Stop structural errors before production.

Run your first set free — up to 25 sheets, marked and returned in minutes.